Tendering results

 

Since 1.12.2006 the German transmission system operators procure the minute reserve via a shared IT-platform. Since 1.12.2007 this platform has also been used to tender in primary and secondary control power.

Detailed information as well as tendering results you can be found on the following website:

www.regelleistung.net

The Amprion tendering results for primary and secondary control power of up to 30.11.2007:

PRIMARY CONTROL POWER

Results

SECONDARY CONTROL POWER

Results

The Amprion tendering results for minute reserve up to 30.11.2006:

MINUTE RESERVE

Before 01.08.2001

2001

2002

2003

2004

2005

2006

back