Long-term development of the transmission system structure

Grid development projects of Amprion GmbH according to § 5.5 a of the CM guideline 

Project

Activity

Expected start of operation

Effects on the cross-border transmission capacity

Grid extension Wehrendorf-St. Hülfe

Construction of a 380-kV-circuit  Ganderkesee- Wehrendorf

2012

1); 2)

Grid extension Diele – Niederrhein (Amprion: Meppen-Wesel)

Construction of  two-380–kV-circuits

2015

1); 2)

380-kV-Interconnection line Niederrhein-Doetinchem

Construction of a new 380-kV-line with two electricity circuits

2013

Increase DE - NL in ca 1000 - 2000 MW 1); 2); 3)

Grid extension in the western Rhineland region

Extension of the 380- kV-grid

2017

1); 2)

Capacity increase

North-South axis between Rommerskirchen and Neuenahr

Extension of the 380-kV-grid

2014

1); 2)

Capacity increase

north-south axis between Neuenahr and Weißenthurm

Extension of the 380-kV-grid

2010

1); 2)

Capacity increase

north-south axis between Dauersberg and Hünfelden

Construction of a new line with two 380-kV-electricity circuits

2010

1); 2)

Grid extension in the Trier/Luxembourg/Saarland region

Extension of the 380- kV-grid

2010

1); 2)

Last amended: 10/2009

1)    The extent to which the activity will affect the transmission capacity between the specified nodes depends on the development of load and generation within the connected grid regions.

2)    The simplified addition of  transmission capacities of interconnection lines can not be related to the real loading capacity and therefore leads to operationally irrelevant results.

3)    Increase of cross-border between Gerrmany and the Netherlands, details see Joint study for a new connection between Germany and the Netherlands

 