Grid Constraints
Long-term and medium-term Network Constraints
The following network constraints exist in the transmission grid:
Area, concerned Control Areas:
relevant for: Transmissions between control areas Amprion and swissgrid [both directions]
| relevant for: | ||
|---|---|---|
| from: | to: | |
| date: | 01.10.2005 | 31.12.2011 |
| time: | 00:00 | 23:59 |
Short-term available capacity:
Congestion management procedure: Auctioning
Remaining capacity: MW
Remarks:
relevant for: Transmissions between control areas Amprion and RTE [both directions]
| relevant for: | ||
|---|---|---|
| from: | to: | |
| date: | 31.12.2004 | 31.12.2011 |
| time: | 00:00 | 23:59 |
Short-term available capacity: Available short term capacity for transits from controlblock Germany towards controlblock France will be published daily under "Transfer capacity auction".
Congestion management procedure: All transmission capacities for for transits from controlblock Germany towards controlblock France will be allocated by a daily joint auction of the transmission system operators, EnBW Transportnetze AG and Amprion GmbH.
http://www.amprion.net/auctions-germany-france
Remaining capacity: is published daily MW
Remarks:
relevant for: Transmissions between control areas Amprion and TENNET [both directions]
| relevant for: | ||
|---|---|---|
| from: | to: | |
| date: | 01.01.2003 | 31.12.2011 |
| time: | 00:00 | 23:59 |
Short-term available capacity: 0
Congestion management procedure: auction:
Remaining capacity: 0 MW
Remarks: none
CURRENT
With regard to the obligations for the allocated capacities given by Amprion in conjunction with other Transmission System Operators the valid auction rules are binding.
Technical standards
The applicable operating, planning and security standards are defined in the Transmission Code 2007 and the ENTSO-E operational handbook.
The appropriate documents can be downloaded from the websites of BDEW and ENTSO-E.