Home

Search

Generation

According to the GUIDELINES ON THE MANAGEMENT AND ALLOCATION OF AVAILABLE TRANSFER CAPACITY OF INTERCONNECTIONS BETWEEN NATIONAL SYSTEMS (EC 1228/2003 and 2006/770/EC),transmission system operators are obliged to publish information on generation in its control area. This information you can find on the common website of the four German TSOs and EEX

www.transparency.eex.com

The prevoius publication of the outages of generation units on the Amprion-site was stopped on 11 January 2010.

 

 

 

 

 

  • deutsch
back
  • company
    • Portrait
    • Facts & Figures
    • Executive Management
    • European Cooperations
    • Environment
    • Locations
    • Good to know
    • Purchasing
  • press-releases
    • Contact
    • Picture archives
    • Corporate brochure
    • Corporate Film
  • system-usage
    • Grid Customers
    • Grid data
      • Vertical load
      • Grid feed-in
      • Demand in control area
      • Generation in the
        control area
      • Wind power
        infeed
      • Cross-border load flows
      • Aggregated commercial
        and physical load flows
      • Generation
      • Outages of generation
        units > 100 MW
      • Structural
        characteristics
      • Forecast margin
      • photovoltaic infeed
    • Market platform
    • Congestion Management
    • Renewable Energy
      Sources (EEG)
    • Combined Heat and
      Power Act
    • Grid Development
    • Offshore liability levy
    • § 19 StromNEV levy
    • Grid Customers
    • Grid data
    • Market platform
    • Congestion Management
    • Renewable Energy
      Sources (EEG)
    • Combined Heat and
      Power Act
    • Grid Development
    • § 19 StromNEV levy
    • Offshore liability levy
CONTACTen / de
print page
sitemap / imprint / disclaimer